Success Stories

Following are true stories of how The Janzen Wahl Group helped clients avoid costly production issues or recover from catastrophic failures. 

To learn more about how The Janzen Wahl Group saved time and money for these and other clients, and can do the same for your project, contact Douglas Wahl at The Janzen Wahl Group, 520-908-0297.  

  • Disaster struck, and a production manager realized his worst nightmare, when a full year’s production of high-purity gas bottles became grossly contaminated. The Janzen Wahl Group helped this customer avoid a year-long shut down in production by developing a novel cleaning and verification protocol.
  • Active corrosion on a component, and all the raw material from which it was made, threatened to cause a 14 week delay in production. Using electro-polish technology and creative special tooling, The Janzen Wahl Group reduced the delay to a single day.
  • When a friendly supplier was purchased by an unfriendly competitor, ordering new assemblies became more complicated and time-consuming. The Janzen Wahl Group provided a time-saving, cost-containing option by developing a recovery program for existing assets.
  • Failures at final test of a major defense product traced back to contamination in the fuel system. Faced with months of schedule delays and $20,000 per system in tear-down and reassembly costs, our client sought an alternative. The Janzen Wahl Group saved precious schedule time and over $1.2 million in rework costs.
  • Undiscovered workmanship issues created dramatic negative consequences for a client’s program. The Janzen Wahl Group’s microscopic inspections prior to precision cleaning shortened the schedule and saved millions.