These are just several EXAMPLES OF HOW we HAve HELPED CLIENTS AVOID COSTLY PRODUCTION ISSUES OR RECOVER FROM CATASTROPHIC FAILURES

Failures at final test of a major defense product traced back to contamination in the fuel system. Faced with months of schedule delays and $20,000 per system in tear-down and reassembly costs, our client sought an alternative. The Janzen Wahl Group saved precious schedule time and over $1.2 million in rework costs.


Undiscovered workmanship issues created dramatic negative consequences for a client’s program. The Janzen Wahl Group’s microscopic inspections prior to precision cleaning shortened the schedule and saved millions

Active corrosion on a component, and all the raw material from which it was made, threatened to cause a 14 week delay in production. Using electro-polish technology and creative special tooling, The Janzen Wahl Group reduced the delay to a single day.